Abstract

Installation of capacitor banks proved to be cost effective approach to correct power factor in industrial plants. Optimum capacitance value that contributes to the maximum PF improvement varies from one system to another. Such value depends on the existing electrical system within the industrial plant. This paper provides industrial plants operators an optimisation model to correct and improve PF. This paper is supported by using both MATLAB programming and iteration loop technique. The Jordanian Petroleum Refinery Company is taken as a case study. Results indicate that PF improvement reached almost unity PF for this case, which yields to a reduction in the overall electricity bill.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.