Abstract

The plan for power supply and distribution system in the Chemical Industry Park is complex. The evaluation method must be easy and truly show the site conditions in order to maintain the proper function of the system. Thus the fuzzy comprehensive evaluation method was chosen and applied in this paper. As for the weight calculation, Analytic hierarchy process (AHP) was used to compute the subjective weight; on the purpose of avoiding strong effect of subjective factors, the standard deviation for each index was calculated, and then the subjective weight was integrated to build the subjective and objective comprehensive weight model. Lastly fuzzy comprehensive evaluation method was applied into the model for assessing the power supply and distribution system in the Chemical Industry Park.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.