Abstract
This work aims to analyze the complementary operation between an existing hydropower plant and a projected wind farm in a remote area of Argentinean Patagonia. With this new generation, the grid element sizes will be insufficient to handle both generation sources at rated. Particulary, a bottleneck will be present at the transmission line and the coupling transformer with the main grid. To avoid this situation, a coordinated dispatch policy of both generation sources is proposed. With this aim, a heuristic algorithm is developed that improves energy generation under the transmission system restrictions. The proposal is assessed and compared with other operation policies on the basis of real data collected over nine years. The benefits of the proposal, that basically consists in reducing wind and hydro power spillage are highlighted. Furthermore, the impact of enlarging the wind farm on the overall power system production is also evaluated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.