Abstract

Uplink power control is essential in 3GPP Long Term Evolution (LTE) to reduce interference caused by adjacent cell users and extending the user equipment (UE) battery life. In open loop power control, no feedback is given by the base station to the user equipments whereas in closed loop power control, feedback for power control is given by eNodeB to UE. Resource scheduling algorithm with power control technique is proposed in this paper, which considers channel characteristics and minimum power requirement at the base station for successful reception of a signal. Simulation results show that (i) the RBs are allocated to maximum UEs based on SINR and power control, (ii) the interference caused by the UEs in the adjacent cell is reduced thereby maximizing the uplink data rate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.