Abstract

As China’s power transmission technology matures, UHV transmission technology has shown the unique advantages in optimizing energy resources, air pollution controlling, and achieving sustainable human development. So UHV grid engineering practice has entered a rapid, large-scale development of new stage in our country. Under the background of large-scale construction, there are huge challenges for key resources and critical management processes. In this paper, starting from the key management processes, based on the risk map approach, data management and data mining, on the basis of identifying the key processes risk, we carried out quantitative assessment of the risks. Through quantitative evaluation of risk, we clarified the attention focus of large-scale UHV grid construction, and it pointed out the direction for the future to strengthen risk prevention and control, to ensure the goal of large-scale construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.