Abstract

The potential for utilizing industrial waste heat for district heating is enormous. There is, however, often a temporal mismatch between the waste heat availability and the heating demand, and typically fossil-based peak boilers are used to cover the remaining heat demand. This study investigates the potential of applying a thermal energy storage tank at the district heating supply system at Mo Industrial Park in Norway, where waste heat from the off-gas of a ferrosilicon production plant is the main heating source. To cover peak heating demands, boilers based on CO gas, electricity, and oil are applied. The reduction in peak heating costs and emissions is evaluated as a function of tank size for two different scenarios: (1) a scenario where CO gas, which is a byproduct from another nearby industry, is the main peak heating source; and (2) a scenario where no CO gas is available, and electricity is the main peak heating source. The highest economic viability is obtained with the smallest storage tank with a volume of 1000 m3, yielding a payback period of 7.1/16.2 years and a reduction in total heat production costs of 14.6/10.0% for Scenarios 1/2, respectively. The reduction in CO2 emissions is 19.4/14.8%, equal to 820/32 ton CO2 for the analyzed period. Sensitivity analysis shows a significant reduction in payback period for Scenario 2 with increasing electricity prices, while the payback period in Scenario 1 is most sensitive to the emission factors.

Highlights

  • The amount of industrial waste heat available in Europe is estimated to be in the same order of magnitude as the total buildings’ heating demand [1]

  • This study investigates the potential of applying a thermal energy storage tank at the district heating supply system at Mo Industrial Park in Norway, where waste heat from the off-gas of a ferrosilicon production plant is the main heating source

  • The reduction in peak heating costs and emissions is evaluated as a function of tank size for two different scenarios: (1) a scenario where CO gas, which is a byproduct from another nearby industry, is the main peak heating source; and (2) a scenario where no CO gas is available, and electricity is the main peak heating source

Read more

Summary

Introduction

The amount of industrial waste heat available in Europe is estimated to be in the same order of magnitude as the total buildings’ heating demand [1]. Many of these waste heat sources are located in areas with high heat demand density, suited to be utilized for district heating (DH). A major share of industrial waste heat is currently not utilized Reasons for this may be both technical and economic barriers for recovering and transporting the heat, as well as geographical and temporal mismatch between the availability of excess heat and the heat demand [2]. TES combined with electric boilers allow the DH supplier to use Energies 2020, 13, 3923; doi:10.3390/en13153923 www.mdpi.com/journal/energies

Methods
Results
Conclusion