Abstract

The purpose of this study is to examine the potential benefits, challenges, and dynamics of implementing the integration of Risk Management (RM) and Stakeholder Management (SM) on a Gold Processing Plant Construction Project in Central Sulawesi, Indonesia. The method used is qualitative approach using the grounded theory method, with primary data from stakeholder interviews and secondary data from literature studies. The results show that Relationship Mode 3, i.e. Management of Stakeholder Differences Concerning Risk, is most applicable, as it improves conflict management and risk response strategies. Recommendations include the integration of this mode into the financial model as a risk management system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.