Abstract

The Damar road section is a connecting lane for the Pasar Raya Padang area which starting to face parking problem. The indicator is the disruption of the flow and the high accumulation of parking volume on Jalan Belakang Olo section. These affected to the decrease on the level of the road services (LOS) on Jalan Damar Padang. So, the analysis of LOS, parking characteristics and parking management on Jalan Damar were carried out. The results of the parking characteristics analysis during the three days of observation showed that the average parking duration was 34-35 minutes, the maximum Parking Turn Over was 3.6 vehicles /day/space, and a maximum Parking Index was 84.91 %. The level of service level value indicated that the degree of saturation was 0.51 (DS <0.80) and it categorized to the B level; the flow classified stable with the average travel speeds ≥ 40 km / hr. The results of the traffic volume analysis trends and the volume of parked vehicles are contradictory. This could answer the question why that on parking activities the Jalan Damar did not caused a significant problem. Management of the on street parking through a Parking Meter Machine at this location is recommended. In the initial stage, the results of the parking characteristics analysis and the lay-out of parking lot can be offered. However, the further study will be needed to determined such as the vehicles growth rate and parking tariff to avoid the impact on the Level of Service.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.