Abstract

SINQ Target-11 was in operation in 2015 and 2016. It was shut down due to an incident in June 2016, during which the pressure drop in the cooling water loop increased significantly, and meanwhile, the activity of the cooling water also increased tremendously. The evidence indicated a serious failure of the target. As this is the first severe failure since SINQ came into operation in 1997, some post-irradiation examinations (PIE) were performed to analyze the failure mechanisms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.