Abstract

The post-evaluation of electric power construction project is an important link, which is necessary in electric grid projects cycle. An advanced method of post-evaluation is proposed by combining Rough Set (RS) theory and Grey System (GS) theory, defined as Grey Rough Set (GRS). According to post-evaluation project experiences, this paper provides the method of index screening by attribute reduction and weight decision.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.