Abstract

In order to enable further overhang of the flotation tailing dump and its exploitation in the safe and stable conditions up to the designed elevation of K+545 m altitude, since the stability coefficients in a part of the tailing dump next to PS Kaludjerica are below the minimum due to a wide seepage front through the outer slope of the embankment, its rapid rehabilitation is necessary. In this paper, the problems affecting the rehabilitation and further overhang of the tailing dump are present.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.