Abstract

A new high resolution coincidence Doppler spectrometer is under development at the positron beam facility NEPOMUC at the research neutron source FRM II. A Ni(100) re-moderation foil will be installed at the new spectrometer in transmission geometry for producing a positron beam with high brightness. Therefore, a magnetic lens for focusing the positrons onto the re-moderator and an electrostatic lens system for focusing the beam onto the sample have to be designed and simulated. The aim is to reach a beam diameter below 10 μm at the sample position for high resolution experiments. The current status of the project will be described and presented.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call