Abstract

American railroads plan to complete implementation of their positive train control (PTC) systems by 2020, with the primary safety objectives of avoiding intertrain collisions/train derailments and ensuring railroad worker safety. Under published Interoperable Electronic Train Management System (I-ETMS) specifications, the onboard unit (OBU) communicates with two networks: 1) the signaling network that conveys track warrants to occupy blocks and 2) the wayside interface unit (WIU) network, a sensor network situated on tracks to gather navigational information. These include the status of the rail infrastructure (such as switches) and any operational hazards that may affect the intended train path.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.