Abstract

This article explores the risk and return relationship of active portfolios subject to a constraint on tracking-error volatility (TEV), which can also be interpreted in terms of value at risk. Such a constrained portfolio is the typical setup for active managers who are given the task of beating a benchmark. The problem with this setup is that the portfolio manager pays no attention to total portfolio risk, which results in seriously inefficient portfolios unless some additional constraints are imposed. The development in this article shows that TEV-constrained portfolios are described by an ellipse on the traditional mean–variance plane. This finding yields a number of new insights. Because of the flat shape of this ellipse, adding a constraint on total portfolio volatility can substantially improve the performance of the active portfolio. In general, plan sponsors should concentrate on controlling total portfolio risk.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.