Abstract

Abstract In heterogeneous stratified reservoirs with low vertical communication between the layers, the best results are normally achieved if the separate layers are produced with a separate set of Wells. However, in a commingled production with poor vertical sweep due to high permeable thief zones, an improved behavior of such a reservoir can be efficiently attained by controlling the injection and production rates of wells to reduce (or stop) injection in the thief zones, and/or production from high permeable layers with high water cut. Technically this can be done by recompletion of wells or with the application of gel technology. The problem high GOR & high water cut wells of Bombay High L-III reservoir can be classified into three categories: Wells producing high amount of gas &/or water due to hardware leak and flow behind casing. The unwanted gas/water production here is due to contribution from zones not opened/exposed for production.Wells producing from multiple layers and a single layer producing major amount of gas or water. The unwanted water production may be due to breakthrough of injection water in one or more high permeable layers. The unwanted gas production may be due to cusping.Wells where early breakthrough has occurred due to thin high permeability streaks in a sublayer between Injectors and Producers. Here, the treatment may involve treating a portion of sublayer. In the past several Chemical water shutoff jobs in Bombay High Field have resulted in failures. The job failure can mainly be attributed to high reservoir temperature and incompatibility of Gel system with reservoir rock. Gel systems were quite sensitive to variations in temperature and pH. Also cross flow in the well bore during shut in conditions was also an important reason in some cases. An improved polymer gel treatment has been successfully applied in Bombay High Field - a high temperature carbonate reservoir, to control excessive gas or water production and to modify the injection profiles. Ten Wells were treated as a pilot: 6 for Gas Control, 3 for Water Control and 1 for Injection Profile Improvement. All the planned wells exhibited at least one, usually more than one, of the following conditions: At least one interval with vuggy porosity, poor primary cement over at least a portion of pay, additional loss of rock volume due to acidization, reservoir pressure less than hydrostatic in producing wells, differential pressure between zones due to differential depletion or water flood support. This paper discusses in detail the lessons learnt from the job failures and the successes with the use of polymer gels in such harsh conditions of Bombay high field.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.