Abstract

Major disturbances in power system might cause big electromechanical oscillations that can influence unwanted operation of different protection functions and lead to a loss of synchronism between generator groups located in two different parts of a power system. In such situations disconnection of subsystems in points closest to the electrical centre of oscillation proved to prevent collapse of a complete system. It is useful to use software for dynamic simulation of electric power systems to make quality control of critical clearing time in power system. The Eurostag Software is used in this article.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.