Abstract

In transmission lines limited by polarization mode dispersion (PMD) there is the option of instead of using PMD mitigation equipment, use regenerators either with (3R) or without (2R) clock recovery. We review some suggested approaches for PMD mitigation and regeneration, and discuss the benefits and drawbacks of the various approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call