Abstract

AbstractPlotting order-ranked data is a standard technique that is used in estimating the probability of extreme weather events. Typically, observations, say, annual extremes of a period of N years, are ranked in order of magnitude and plotted on probability paper. Some statistical model is then fitted to the order-ranked data by which the return periods of specific extreme events are estimated. A key question in this method is as follows: What is the cumulative probability P that should be associated with the sample of rank m? This issue of the so-called plotting positions has been debated for almost a century, and a number of plotting rules and computational methods have been proposed. Here, it is shown that in estimating the return periods there is only one correct plotting position: P = m/(N + 1). This formula predicts much shorter return periods of extreme events than the other commonly used methods. Thus, many estimates of the weather-related risks should be reevaluated and the related building codes and other related regulations updated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.