Abstract
AbstractTemporary equipment may be brought onto a plant site for a variety of process needs. The risk profile of the facility is altered by use of such temporary equipment, but since the time durations of temporary equipment usage are generally small, usually fewer than 90 days per year, the risk increase is also small and is typically not modeled in a probabilistic risk assessment. This article describes some risk issues with temporary equipment in long‐term use, gives a case study of a temporary, diesel‐driven air compressor under extended use at the Idaho National Laboratory, and suggests the need to model temporary equipment in the facility risk assessment if the equipment is used more than a few months. © 2006 American Institute of Chemical Engineers Process Saf Prog, 2006
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.