Abstract

Maintenance activities are a particular concerned at PT XYZ, which is the largest cement producer in Eastern Indonesia. PT XYZ has five main factories located in Pangkep, South Sulawesi, units 1,2,3,4, and 5. In 2019, PT XYZ’s five clinker production only reached 2,445,515 tons or 93, 64% of the target. The details, raw meal production was not achieved, namely 4,041,377 tons or 96.54% of the target set by the company due to the unplanned shutdowns. This research tries to control the breakdowns of raw mill machine by evaluating the availability and day of operation (calendar day). The availability analysis method used is the discrete system simulation approach because the discrete system simulation can accommodate random behavior and dependence between variables. In the existing condition, system availability is 72.83% and calendar day is 239 days. These two parameters are still less than the target. To overcome this problem, experimentation was carried out with 3 scenarios. The best simulation results shows that the preventive maintenance activities changes the value of TTF (Time to Failure), TTR (Time to Repair), and reduces the duration of overhaul activities. This can increase the availability to 83.04% and calendar day to 255 days.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.