Abstract
Abstract In this paper, a robust planning method of regional integrated energy system (IES) considering the uncertainty of cooling, heat and electrical loads on the demand side is submitted. First, the energy hub (EH) model of regional IES with Combined Cooling Heating and Power (CCHP), electric air-conditioning unit (EC) and gas boiler (GB) is established. Second, the uncertainty of load is described by the method of adjustable interval, and the robust planning model of regional IES is formed. Third, the robust programming model can be transformed into a convex mixed integer planning model, and then solved. Finally, the case study is carried out with a comprehensive area of Tianjin in China, the results are analyzed to verify the effectiveness of the proposed planning method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Emerging Electric Power Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.