Abstract

A joint operation planning method for integrated energy storage systems considering reliability is proposed. Firstly, the planning of the power exchange level of the energy storage system is achieved by calculating the optimal power exchange level of the supercapacitor, constructing a model for the optimal configuration of the two-layer energy storage, and using an algorithm for the solution of the model to optimise it. In the experiments, the joint operation planning performance of the proposed method is verified. The experimental results show that the model prediction accuracy is high when the proposed method is used for the joint planning of the integrated energy storage system, and has a more satisfactory joint operation planning performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.