Abstract
1. Planning measures to increase the reliability and safety of hydraulic structures is closely related to reconstruction of hydro developments. 2. Reconstruction of hydro developments is a complex engineering problem which must be solved, as a rule, without complete stopping of the hydrostation for obtaining minimum losses of capacity and power generation while carefully preserving the historical and architectural value of the structures. 3. The need to increase the reliability and safety of hydraulic structures occurs, as a rule: due to geological reasons; due to the poor quality of construction works; due to the original savings of investments in the structure without consideration of local operating conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.