Abstract

Increased population growth, number of vehicles and traffic growth on the Denpasar - Gilimanuk line in the Tabanan Regency region resulted in traffic congestion and accidents. To facilitate the distribution of agricultural products, plantations, open social, economic and cultural relations and to overcome the level of congestion and accidents, it is planned to build a connecting bridge between Belumbang Village and Mambang Village. This study aims to identify the condition of the topology / terrain of the location of the bridge, plan the design of the bridge drawings, estimate the cost of bridge construction, analyze perceptions and community participation in bridge construction. Data collection methods are observation, interview, documentation, questionnaire and literature study. The analysis method consists of quantitative descriptive analysis, Geographic Information Systems, Autocad, unit price analysis. The results of this study are the identification of topological conditions / terrain where bridge construction plans are located on hills and mountains. The design plan for the construction of a bridge with a length of 50 meters and a width of 8.5 meters, namely the design of the upper building in the form of a bridge floor, longitudinal and transverse girder and backrest, the design of the lower building in the form of foundations and supports. The total cost of bridge construction is Rp. 19,699,662,000.00 or Rp. 393,993,240.00 per meter. Public perception of bridge construction is fully stated in the agreement. Community participation is land preparation, mutual cooperation in cleaning bridge routes and approaching the parties in the Tabanan Regency Government.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call