Abstract
Irregularity of ballasted track grows due to gradual deformation of ballast under repeated train passage. Daily maintenance is indispensable to sustain normal track condition. For planning of maintenance policy (MTT, rail grinding, ballast replace), a time history model which considers material deformation is used. In this paper, applying this model, new procedure which can assist decision-making on the maintenance policy is presented. The procedure is formulated under the criterion to minimize maintenance costs, track irregularity and bias of maintenance work concerned with time, using “branch and bound technique” and “Genetic. Algorithm”. And the procedure is analyzed citing several practical example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.