Abstract

ABSTRACTThis study investigates the impact of planned lead times on performance in multistage manufacturing where material requirements planning is used in a make‐to‐stock environment. We simulate a variety of different operating environments and find: (1) planned lead times are important to customer service levels under all operating environments examined, but have a smaller impact on inventory investment; (2) tight due dates introduced by short planned lead times hurt customer service without saving much inventory; (3) small increases to tight planned lead times improve customer service substantially with small inventory increases; (4) co‐component inventories change with planned lead times, and disparity between such inventories is a sign of poor timing coordination; (5) the fixed order quantity rule performs better than the periodic order quantity rule; and (6) tall product structure and large lot sizes require particular attention to planned lead times. The findings also extend the current understanding of planned lead times by including uncertainties such as forecast error, yield loss, and equipment reliability. The study concludes with a way to diagnose and improve poorly set planned lead times.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.