Abstract

Unit-based pull systems control the throughput time of orders in a production system by limiting the number of orders on the shop floor. In production systems where orders can follow different routings on the shop floor, route-specific pull systems that control the progress of orders on the shop floor by placing limits on the number of orders in (parts of) a routing, have shown to be effective in controlling throughput times. This is because route-specific pull systems are able to create a balanced distribution of the amount of work on the shop floor, which leads to shorter and more reliable throughput times. The placement of limits on work-in-progress in a route-specific pull system determines to a large extent the workload balancing capability of such a system. This paper shows how the placement of work-in-progress limits affects the workload balancing capability and thereby the throughput time performance of a route-specific unit-based pull system, namely POLCA.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.