Abstract

The first prototype reinforced soil bridge pier was constructed by means of preloaded and prestressed (PLPS) reinforced soil method, which aims at substantially increasing the stiffness of a geosynthetic-reinforced soil embankment by vertical preloading and prestressing. After the usage for a period of three and half years, cyclic and creep loading tests in the vertical direction were performed on this pier before its destruction work. In this paper, the deformation characteristics of the PLPS structures are discussed based on behaviours of the pier during the construction, the service period, and the final loading tests.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.