Abstract

Even though heavy construction equipment such as a crane or backhoe excavator, is used to perform the task of pipe laying in the trench, workers are required to be inside the trench to guide the excavation, pipe laying, and final alignment. Work place safety has become a major concern in the construction industry over the past few decades, and trench cave-ins have caused serious and often fatal injuries to workers in the United States. The Construction Automation and Robotics Laboratory(CARL) at North Carolina State University has developed an alternative which involves advanced new technology: the prototype robotic excavation and pipe installation system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.