Abstract

Usually boilers are fed by some water that blended from demineralized water and groundwater. Commonly, this such water comprises any impurities such as Ca; Mg; Na; Cl; SO4 which the minerals tend to precipitate as the scale. The scale forms a layer and blocks the pipe, furthermore obstructs water circulation. This research aims to predict the time that the pipe entirely blocked under linear and cross-flow operation. The results showed that the operation STHE in linear flow need the time in longer than cross flow to fully blockage the pipe

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.