Abstract

Woodside is an Australian oil and gas company and a leading global operator of offshore gas platforms and onshore LNG processing facilities. It is a public company listed on the Australian Securities Exchange headquartered in Perth, Western Australia. Woodside operates the Goodwyn A gas platform on behalf of the North West Shelf (NWS) Project. Woodside assessed Li-ion battery technology and considered the technology mature and ready to be utilised on offshore and onshore operating assets. Woodside operates dedicated islanded gas turbine power generation at each of its onshore and offshore facilities. It was concluded that a large battery energy storage solution (BESS) can deliver several advantages if connected to such an islanded power generation system. The most significant benefit materialises by using a BESS as backup (or spinning reserve) for the gas turbine generators (GTGs). Woodside decided to pioneer the Li-ion BESS technology in a first of its kind application on the NWS Project offshore Goodwyn A gas platform. The Goodwyn A BESS is designed for a 1 MW power and 1 MWh energy capacity, which is considered sufficient to provide the spinning reserve for the Goodwyn A platform. Currently, Goodwyn A operates four 3.2 MW GTGs to provide a typical load of 7–8 MW, with one GTG providing the N+1 spinning reserve. When the BESS is connected to the power generation system, Goodwyn A will operate three GTGs, with the BESS proving the backup in case one of the GTGs trip. The BESS will provide the full 1 MW for a minimum of 1 h, which will give the operators enough time to start the standby GTG or adjust the facility loads (load shedding). The result will be a decrease in overall fuel gas consumption (due to better efficiencies on the remaining GTGs in operation) and a related reduction in CO2 emissions. The project supports the overall objective of the North West Shelf Project to improve the energy intensity of its facilities by 5% by 2020. Woodside believes that developing capability and experience on the installation of BESSs, using Goodwyn A as an early adopter, will facilitate similar and larger installations on other Woodside operated offshore and onshore assets. This is one of the technologies Woodside believes will play an important role to ensure a lower carbon future globally.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.