Abstract

In lignite-fired power plants, the high water content of lignite (35-40%) is responsible for significant reductions in boiler efficiency due to the large amounts of heat loss experienced through water evaporation during coal combustion. Installation of a water condensation device in the outlet of the desulfurization absorption tower can recover substantial amounts of water and latent heat from the flue gas that containing saturated steam. In the present study, a pilot test platform was built into a 600MW lignite-fired power plant, and a 50,000m3/h flue gas flow was been extracted and cooled by 5°Cduring the test. Using our theoretical model for this energy efficiency innovation, the test results demonstrate that 129.5GJ/h of latent heat can be recovered and 61.6t/h condensate water can be collected from the flue gas (2,500,000m3/h) for the600MWlignite-fired power plant. The wet flue gas desulphurization system (wet FGD) consumes the supplemental water of 60-80 t/h for this power plant. Consequently, the water recovery quantity of 73 t/h demonstrate that zero net water consumption can be achieved by returning the recovered water back into wet FGD.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.