Abstract

In order to reduce the cost of chemical softening, the seeded precipitation assisted nanofiltration (NF) process was introduced into zero liquid discharge (ZLD) of flue-gas desulfurization (FGD) wastewater treatment. A pilot-scale system was developed and run for 168 h in a coal-fired power plant. The system mainly consists of lime softening, ambient temperature crystallizer (ATC) and NF, in which the raw water treatment capacity was 1 m3/h. The results indicated that the system operated stably, the softening cost was 13.30 RMB/m3, and the electricity cost was 3.39 RMB/m3 for the FGD wastewater in this pilot system. High quality gypsum was got from the ATC unit, of which the purity was 95.8%. Through this system, the hardness removal rate was higher than 98.9% and the water recovery rate reached 96%. In addition, the pressure and permeate flux kept stable in the ultrafiltration (UF) unit and NF unit, indicating no scaling occurred in the two units during 168 h test. Thus, a feasible and cost-effective process was provided by using the seeded precipitation assisted NF to deal with the FGD wastewater.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call