Abstract

The pilot scale biopile system was designed and operated for evaluation of bioremediation efficiency for petroleum contaminated soil. The pilot scale biopile consisted of biopile dome, aeration system and monitoring system and two biopiles were operated with nutrients and inoculum for more 100 days. The test pile A and B were analyzed with regard to pH, total carbon contents, water contents, nutrients (N, P) and TPH. The initial TPH concentrations for pile A and pile B were about 10,000 mg/kg and 2,300 mg/kg, respectively. After 100 days, the TPH contents decreased about 70% in the pile A and 30% in the pile B. Also, n-<TEX>$C_{17}$</TEX>/pristane and n-<TEX>$C_{18}$</TEX>/phytane ratios in all pile were significantly changed. The microbial densities in the pile A was increased by approximately <TEX>$10^7$</TEX> CFU/g-soil~<TEX>$10^8$</TEX> CFU/g-soil, but there was almost no changed in the pile B. The average biodegradation rates were calculated about 66.8 mg/kg-day in the pile A and 10.9 mg/kg-day in the pile B. Over the course of operation period, pile temperature was considered the major limiting factor for the efficiency of all biopiles.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.