Abstract

Bottom slime and shaft mudcake are two principal deteriorative factors affecting the mobilization of bearing capacity of slurry bored piles. As an effective later improvement technology, post-grouting can significantly improve bored pile bearing capacity. Based on static load test results of Beijing capital international airport project, vertical bearing properties of post-grouted bored pile have been studied. The analyses reveal that: with pile-toe and pile-shaft post-grouting, the interface between pile and surrounding soil was strengthened and the relative sliding displacement in between was reduced, end resistance of pile was enhanced and could be mobilized at earlier stage with smaller sliding displacement. As a result, the performance of bored pile was improved with increased bearing capacity and reduced settlement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.