Abstract
This report describes a new technique to install piezometers under flowing artesian conditions. A unique procedure and special equipment were developed and fabricated in the field to facilitate the piezometer installation in the abutments of an arch dam. The foundation pressures were recorded during the reservoir filling. The instruments responded accurately to the reservoir water level fluctuations. The instruments were monitored for three years.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have