Abstract

The MEGAPIE target, after successfully operating for 4months at a beam power of 0.77MW, is now being prepared for post irradiation examination PIE. The lead–bismuth eutectic (LBE) target was irradiated from August until December 2006, and in this period received a beam charge of 2.8Ah of 575MeV protons. After that, the target was stored in the target storage facility of PSI, waiting for its post irradiation examination. In the meantime several campaigns of tests have been conducted by PSI and ZWILAG, the interim storage facility of Swiss nuclear power plants. In these tests the feasibility of the conditioning of the target and the extraction of sample material for the PIE has been proven. After transport to the hot cell facility at ZWILAG in June 2009, the dismantling of the MEGAPIE target started. It finally was cut into 21 pieces. Ten of these pieces will be shipped to the Hot Laboratory of PSI (‘PSI hotlab’) to extract samples from the structural materials as well as from the LBE. Currently it is foreseen that the sample extraction will start in the first half of 2011. The remaining parts of the MEGAPIE target were conditioned as radioactive waste. The present paper will mainly focus on the dismantling and first visual inspection of the MEGAPIE target. In addition an outlook on the PIE phase of MEGAPIE is given.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call