Abstract
Tucson Electric Power Company (TEP) currently has nearly 5.0 MWdc of utility-scale grid-connected photovoltaic (PV) systems that have been installed in its service territory since 2000. Most of this installed PV capacity is in support of the Arizona Corporation Commission Environmental Portfolio Standard (EPS) goal that encourages TEP to generate 1.1% of its energy generation through renewable resources by 2007, with 60% of that amount from photovoltaics. The EPS program provides for multi-year, pay-as-you-go development of renewable energy, with kWhac energy production as a key program measurement. A total of 26 crystalline silicon collector systems, each rated at 135 kWdc, have been installed at the Springerville, AZ generating plant by TEP making this one of the largest PV plants in the world. These systems were installed in a standardized, cookie-cutter approach whereby each uses the same array field design, mounting hardware, electrical interconnection, and inverter unit. This approach has allowed TEP to achieve a total installed system cost of $5.40/Wdc and a TEP-calculated levelized energy cost of $0.10/kWhac for PV electrical generation. During this time, much has been learned regarding performance, cost, maintenance, installation and design. This paper presents an assessment of these topics and a perspective associated with this PV experience.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.