Abstract

This research aimed to investigate the phosphorus (P) removal of a series of laboratory-scale unvegetated vertical-flow constructed wetland systems using anthracite, steel slag and related blends as substrate in treatment of low concentration domestic sewage. The long-term performance of P removal was firstly studied by using single substrate of anthracite or steel slag, and three systems applying various combined substrates were investigated when the average P loading rate varied between 0.9 and 1.5 g TP/m2 x d. The results demonstrated that both anthracite and steel slag systems were highly effective in removing total P (CTP, 77.17 +/- 23.34% and 90.26 +/- 4.48%) and soluble reactive P (SRP, 92.14 +/- 12.56% and 96.20 +/- 2.58%). The system filled with anthracite, vermiculite and steel slag from the top down removed 82.45 +/- 9.52% and 87.83 +/- 8.58% of TP and SRP, respectively. However, other combined substrate systems showed comparative low and fluctuant P removal. The effluent pH was maintained at 7-9, which met environmental requirements of China. Therefore, anthracite provides a long-term high efficiency of P removal and may be a promising substrate from the standpoint of the effluent pH, and the arrangement of combined substrate has a prominent effect on P removal.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call