Abstract

Active filters, which facilitate phosphorus (P) removal via precipitation and/or adsorption, offer a promising ‘appropriate technology’ for upgrading small wastewater treatment systems. Research on active filters for P removal using steel slag material has been conducted in laboratories across the world, however, field experiments have been limited and long-term data is practically non-existent. This paper presents a decade of experience on P removal by active slag filters at a full-scale treatment plant. During 1993–1994 the filter removed 77% of the total phosphorus (TP), and over the first 5 years of the filter's operation it reduced the mean effluent TP concentration to 2.3 mg l −1. However during the sixth year of operation P removal was significantly reduced. Over the 11 years of monitoring, 22.4 tonnes of TP was removed by the filter, 19.7 tonnes of this in the first 5-year period. It was determined that the slag material maintained its maximum removal potential until reaching a P-retention ratio of 1.23 kg TP per tonne of slag. This paper provides the first long-term field data for slag filters, and shows that they can provide P removal for a half a decade before filter replacement/rejuvenation is required.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.