Abstract

In operating a multi-cluster tool, it needs to coordinate the activities of multiple robots. Thus, it is very challenging to schedule it. This paper conducts a study on one-wafer cyclic scheduling for multi-cluster tools whose bottleneck cluster tool is process-bound. The system is modeled by a Petri net. With this model, conditions under which a one-wafer cyclic schedule exists are developed. Based on them, it is shown that, for any multi-cluster tool whose bottleneck cluster tool is process-bound, there is always a one-wafer cyclic schedule. Then, a method is presented to find the minimal cycle time and the optimal one-wafer cyclic schedule. It is computationally efficient. Illustrative examples are used to show the applications and effectiveness of the proposed method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call