Abstract
It is very challenging to obtain a one-wafer cyclic schedule for the widely used multi-cluster tools in semiconductor manufacturing. This work studies the scheduling problem for a single-arm tree-like multi-cluster tool that is process-dominant. A resource-oriented Petri net (PN) model is developed to describe its operation behavior by explicitly modeling robot waiting. Based on it, sufficient and necessary conditions are for the first time established to find a one-wafer periodic schedule. By determining robot waiting time, efficient algorithms are proposed to find such a schedule with the minimal cycle time. An example is used to show its application.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.