Abstract

This paper addresses the optimisation of failure-prone transfer lines with delays for material transfer and with a constant demand. A continuous flow model with delays is proposed. Compared with traditional continuous flow models in which materials flow from one station to another instantaneously, material flowing out a machine waits a period of time called a delay before arriving at its downstream buffer. Machines are subject to time-dependent failures. Times between failure and times to repair are random variables with a general distribution. The production of each machine is controlled by a base stock policy. We propose a simulation-based optimisation method for determining optimal base stock levels in order to minimise the long-run average cost incurred by inventory holding and demand backlogging. It is based on an infinitesimal perturbation analysis for the estimation of gradients along the simulation. The unbiasedness of the gradient estimators is established.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.