Abstract

The CRYRING accelerator, previously located at the Manne Siegbahn Laboratory of Stockholm University, has been chosen by the FLAIR collaboration as the central accelerator for the planned facility. It has been modified to allow for high-energy injection and extraction and is capable of providing fast and slow extracted beams of antiprotons and highly charged ions. It is currently being installed at the ESR of GSI Darmstadt where it can be used with highly charged ions. The future possibilities for its use with slow antiprotons will be discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.