Abstract

In a dynamic flow shop scheduling model, each released job has to be executed on a set of machines in series following the identical route. The criterion of optimality, total k-power completion time (k≥2) is addressed for this problem. Given its NP-hardness, a branch and bound (B&B) algorithm is designed to obtain the optimal solutions for small-scale problems. On the basis of an initial population generated by the upper bounds of the B&B algorithm, a discrete differential evolution algorithm is introduced to solve medium-scale problems. As the by-product of the B&B algorithm, a sequence-independent lower bound with performance guarantee is presented as a substitute of the optimal solution for large-scale problems. Moreover, the worst-case ratio of the shortest-processing-time-based rule under a consistency condition is provided for the problem. The numerical experiments demonstrate the effectiveness of the proposed algorithms and the new lower bound.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call