Abstract
In the project smartrail 4.0 Swiss Federal Railways (SBB) aims for a higher degree in automatization of the railway value chain (e.g. line planning, timetabling and vehicle scheduling, etc.). In the context of an applied research project together with SBB, we have developed an extension of the Periodic Event Scheduling Problem (PESP) model. On one hand the extension is based on using a finer resolution of the track infrastructure, the so-called mesoscopic topology. The mesoscopic topology allows creating timetables with train lines assigned to track paths. On the other hand, we use a known, flexible PESP formulation (FPESP), i.e. we calculate time intervals instead of time points for the arrival resp. departures times at operating points. Both extensions (mesoscopic topology and flexibility) should enhance feasibility of the timetables on the microscopic infrastructure. We will call our model therefore track-choice, flexible PESP model (TCFPESP).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.