Abstract
The impact of lead time reduction on an integrated periodic review inventory system comprising a single vendor and multiple buyers with a step crashing cost function and service level constraints is explored in this study. Distribution free and normal distribution procedure with Lagrange multipliers is applied to determining the lead time, the common shipment cycle time, the target levels of replenishments and the number of shipments per production cycle so that the expected total system cost is minimised. The efficient algorithm is constructed to find the optimal lead time, the common shipment cycle time, the target levels of replenishments and the number of shipments per production cycle simultaneously. Moreover, the numerical example is introduced to illustrate the proposed model. Through sensitivity analysis, some observations and managerial implications are provided.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Services Technology and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.