Abstract

The underlying goal of JIT philosophy is to eliminate waste, which is possible only through certain measures such as reducing the lead time, crashing of the setup cost, improving the service level etc. All these measures are achievable through an extra investment. The present study investigates the effect of crashing of the lead time and setup cost in periodic review inventory model, where the demand during the protection interval follows the normal distribution under the service level constraint. Numerical example is presented to illustrate the results of the proposed model along with the sensitivity analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.