Abstract
This paper proposes a model to find optimal periodic inspection interval for a multi-component repairable system with failure interaction. Failure of one component of the system is hard, i.e., as soon as it occurs, the system stops operating. Failures of the other components are soft, namely, they do not cause the system stop. Soft failures increase the system operating costs and are detected only if inspection is performed. Thus, the components with soft failure are periodically inspected simultaneously and are repaired if found failed. When the component with hard failure fails, it is also repaired. However, it increases the failure rate of the other components. The objective is to find the optimal inspection interval such that, on a finite time horizon, the expected total cost is minimized. The proposed modeling approach is illustrated through a simplified numerical example for a general infusion pump.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The International Journal of Advanced Manufacturing Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.