Abstract

This paper considers periodic and sequential preventive maintenance (PM) policies for the system with minimal repair at failure: the PM is done (i) at periodic times kx and (ii) at constant intervals xk (k = 1, 2, ···, N). The system has a different failure distribution between PM'S and is replaced at the Nth PM. The optimal policies which minimize the expected cost rates are discussed. The optimal x and N of periodic PM and {xk} of sequential PM are easily computed in a Weibull distribution case.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.